mbi|k2m architecture, Inc's new The space is not only design forward, but
  building was designed with environmentally and economically
  a goal of achieving LEED Silver. responsible. With considerable efforts
  As the Owner, Architect, Interior to select materials, the Design brought
  Designer, and Tenant of the together three key concepts:
  building they had the opportunity ......~ Sustainable (Green) design
  to investigate, test, and utilize ......~ Budget
  cutting edge design and building ......~ Style
  system management. Often times these elements are
     though to be mutually exclusive.
 
 
     
 
 
 
SITE MAP.... ......DISCLOSURES...........CONTACT...........NEWS.........EMAIL LIST.........ONLINE CATALOGS   Case Studies
 
   
 
 
 
 
 
 
 
 
 
 
mbi|k2m architecture
    If you're interested in hearing more about
    this project, please contact Ann Lang at:
    alang@srose.com